Waste Management
Developing a Waste Management Plan. In the new CalGreen code there are specific mandatory requirements for waste diverted from the landfill.
In order to meet these requirements you will need to develop a waste management plan for your project that clearly states the goals for the percentage of waste to be diverted (given either by weight or volume), the analysis of waste that will be generated (what is it and how much will there be), the handling procedures for the waste that is generated, the plan for communicating this information and engaging the construction crews, and the plan for reporting (how will you track and share your results?).
It is extremely important to remember to do everything you can during construction to keep to the site in mind.
Limit site disturbance by preserving existing natural vegetation and use fencing to clearly outline protected areas. Stabilize exposed soils with mulch, temporary seeding, or nets and blankets.
Establish controlled construction access with protocols for all vehicles keeping in mind that compaction from heavy machinery during construction degrades soil structure and reduced infiltration rates (causing increased runoff and flooding potential).